Promote dev to test: 7 changes #328

Merged
nika.farzan merged 7 commits from dev into test 2026-09-26 15:36:32 +03:30
Member

Included

  • chore(deps): update forgejo-runner to 13.1.0
  • chore(deps): update mlflow to 3.15.2
  • feat(platform): add alloy v1.19.2
  • fix(alerts): lengthen LokiRequestErrors pending period to 10m
  • feat(cluster): upgrade k3s to v1.37.0+k3s1
  • chore(deps): update seaweedfs to 4.47
  • chore(deps): update loki to 3.7.8
## Included - chore(deps): update forgejo-runner to 13.1.0 - chore(deps): update mlflow to 3.15.2 - feat(platform): add alloy v1.19.2 - fix(alerts): lengthen LokiRequestErrors pending period to 10m - feat(cluster): upgrade k3s to v1.37.0+k3s1 - chore(deps): update seaweedfs to 4.47 - chore(deps): update loki to 3.7.8
chore(deps): update forgejo-runner to 13.1.0
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 12s
028a8db4bf
chore(deps): update mlflow to 3.15.2
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 9s
33a78f7c43
feat(platform): add alloy v1.19.2
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 9s
f36f225aad
fix(alerts): lengthen LokiRequestErrors pending period to 10m
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 9s
18f4eb13e3
It fired during routine restarts.
feat(cluster): upgrade k3s to v1.37.0+k3s1
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 9s
add4407964
Control plane first, then the worker after a drain. Removed-API report was clean.
chore(deps): update seaweedfs to 4.47
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 11s
f1a44fb778
chore(deps): update loki to 3.7.8
All checks were successful
infra / Validate and apply cluster configuration (push) Successful in 8s
afe3e9e3da
Author
Member

Checked dev logs and metrics before promoting.

Checked dev logs and metrics before promoting.
nika.farzan left a comment

Approving; the checks are green.

Approving; the checks are green.
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
telekabin/platform-infra!328
No description provided.