Promote dev to test: 5 changes #268

Merged
nika.farzan merged 5 commits from dev into test 2026-10-17 14:11:52 +03:30
Member

Included

  • chore(deps): update conftest to v0.70.1
  • fix(alerts): lengthen EventMeshConnectionDrops pending period to 15m
  • chore(deps): validate manifests against Kubernetes 1.37 schemas
  • chore(deps): update conftest to v0.71.0
  • chore(deps): update conftest to v0.71.1
## Included - chore(deps): update conftest to v0.70.1 - fix(alerts): lengthen EventMeshConnectionDrops pending period to 15m - chore(deps): validate manifests against Kubernetes 1.37 schemas - chore(deps): update conftest to v0.71.0 - chore(deps): update conftest to v0.71.1
chore(deps): update conftest to v0.70.1
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 36s
b534ad9f2e
fix(alerts): lengthen EventMeshConnectionDrops pending period to 15m
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 27s
b9a83cfa82
chore(deps): validate manifests against Kubernetes 1.37 schemas
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 38s
a3795b98ed
chore(deps): update conftest to v0.71.0
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 38s
c38a79ca62
chore(deps): update conftest to v0.71.1
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 36s
71090a4652
Author
Member

No regressions on the dev dashboards.

No regressions on the dev dashboards.
nika.farzan left a comment

Approving; the checks are green.

Approving; the checks are green.
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
telekabin/telekabin-deploy!268
No description provided.