Promote dev to test: 4 changes #44

Merged
nika.farzan merged 4 commits from dev into test 2025-03-11 15:36:44 +03:30
Member

Included

  • chore(object-vault): bump to 1.3.2
  • chore(deps): update conftest to v0.58.0
  • perf(web): raise memory limit to 384Mi
  • chore(app-functions): bump to 0.6.4
## Included - chore(object-vault): bump to 1.3.2 - chore(deps): update conftest to v0.58.0 - perf(web): raise memory limit to 384Mi - chore(app-functions): bump to 0.6.4
chore(object-vault): bump to 1.3.2
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 7s
3f6700676c
Includes the fixes merged since the last tag.
chore(deps): update conftest to v0.58.0
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 11s
2c4dfc2be0
perf(web): raise memory limit to 384Mi
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 10s
39de3211b7
Usage peaked close to the limit during the campaign.
chore(app-functions): bump to 0.6.4
All checks were successful
Engineering delivery / Validate and deliver manifests (push) Successful in 9s
86590f19f8
Author
Member

Checked dev logs and metrics before promoting.

Checked dev logs and metrics before promoting.
nika.farzan left a comment

Checked the diff, approving.

Checked the diff, approving.
Sign in to join this conversation.
No reviewers
No milestone
No project
No assignees
2 participants
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
telekabin/telekabin-deploy!44
No description provided.